Day 37
Ok so that's not entirely true, but the lack of updates recently is not one that I have been able to control...
Lot's of work got done over the last 9 days, holes were dug... Lots of holes... And when someone digs holes they sometimes dig a little to deep, and a little to intensely. Sometimes when someone digs under an old decrepit fish pond they find the water mains, next to the Foxtel Cable, and sometimes when they are digging that hole, under that pond, next to the water mains and the Foxtel cable, they dig straight through the water mains and Foxtel cable, let's face it, it's easier then digging around it!!!
If you haven't clued on yet, the lack of updates is a direct result of me not having any cable, which provides not only my television but also my internet access, it is really depressing when you realise just how dependent on the internet you are to have a life...
On the upside no internet allowed me to experience the greater things in life, like going out to the pub, and crashing a private birthday party until 0300...
Of course let us not forget that a hangover is a perfectly natural response to such adventure...
Let us also not forget that builders like to build from 0700...
That brings us to today....
Being insanely hungover, and not in a pleasant state of being I was somewhat disgruntled when a builder stormed into the room, not realising I was there, to test the toilet... After some initial shock on his behalf he informed me that I now had no sewage... Exciting stuff...
So I now know that I won't have any sewage for 24 hours... Interesting times ahead...
I can't upload pictures at the moment so a quick run down for the avid readers of ones demise...
-Excavation took place in the front yard to make way for the new retaining wall and new garage... It's a really big hole and very much looking like the Simpson Desert...
-More excavation out the back, it appears as though the cheap a@# builder used a dodgey land fill, hence the voids around the pool, the downside is that for the new footing they had to dig about 5 foot down for the sake of engineering...
-Concrete was poured for the footing this afternoon... Slab is being layed first thing next week.
-Plumbers out tomorrow morning to re...um...plumb?
Some interesting facts...
-So far over 40 truckloads of fill and other bits of trash has been taken away, with about another 30 to go until the excavation part is complete...
- The cheap land fill that was used consisted of all sorts of tree cuttings, which shouldn't be used in a landfill, why you ask? Wood/trees decompose, creating voids...
-One tyre on a bobcat has been punctured...
-I really need to go to the bathroom...
Photos will be up ASAP, along with a tale of my adventures with Triple M and trying to score a ticket to U2 for my cousin...